The object of these tests was to determine the capacity of ball-mills when crushing in two stages. The conditions of the test were as follows: First Stage of Ball Milling. Feed rate, 15.31 T. per hr. Classifier, Dorr duplex with baffled overflow. Ball load, 28,000 lb. of 3- and 2-in. balls. Speed, 23.8 r.p.m. Ball-mill power, 108 kw.