To carry out the analysis, the main conveyor system was divided into three sub-systems including conveyors 1, 2 and 3, which are located on the TBM machine, inside the tunnel and station. Analysis results indicated that reliability of conveyor subsystems 1, 2 and 3 after 267, 58 and 300 h reaches to zero, respectively. Moreover, availability ...