Over a minimum 8.5-year mine life, MRC will produce 87,000 oz. gold per year from two open pit deposits: Touquoy and Beaver Dam. At a gold price of US$1,200 per oz., the initial capital cost to build MRC was projected at $137.3 million at a 5% discount rate, according to a 2015 feasibility study.